Showing 198 of 310 Projects
The North East Link Program is set to transform Melbourne's transportation system, and Dulux® Protective Coatings played a role in ensuring the durability of the concrete tunnel moulds used in the project with high-quality protective coatings.
The Oakey Power Station required high performance protection from corrosion and intense UV exposure. Our workhorse combination of Durebild STE and Weathermax HBR was selected for durability and to minimise maintenance.
The Southern Midlands Council's Oatlands Aquatic Centre was at risk of corrosion due to its exposure to water and humidity. Dulux® Protective Coatings provided a unique coating system to ensure the longevity of the facility.