Somers Standpipe Refurbishment, VIC

Water and Wastewater Treatment

The Somers Standpipe internal lining had to be completely removed and replaced. Abrasive blast cleaning to AS1627.4 Sa 3 was carried out and two coats of Duremax GPE at 320 microns total DFT now hold the town's water.