Brisbane's Cross River Rail project upgrades stations along the Beenleigh line and improves access to the rail network. Yeronga and Fairfield stations have undergone significant upgrades, including a high-performance coating system installed by Seamless Industrial Solutions and IDEC Solutions.
1 x DULUX Zincanode® 402 @ 75 μm
1 x DULUX Duremax® GPE MIO @ 200 μm
1 x DULUX Quantum® V92 @ 125 μm