Pakenham Station Lift Shafts & Steelwork, VIC

Infrastructure

The newly constructed Pakenham Station, an integral part of a significant level crossings removal project, showcases an exceptional three-coat system that adheres to Australian Standard AS/NZS 2312.1:2014 for lift shaft protection against atmospheric corrosion.

Specifications

1 x DULUX Zincanode® 402 @ 75 μm

1 x DULUX FIRETEX® Platinum-120 @ required FRL thickness requirements

1 x DULUX Weathermax® HBR @ 75 μm