Aubin Grove Train Station, WA

Infrastructure

A 600-tonne project involving two large span steel bridge sections over the busy Kwinana Freeway, Aubin Grove train station required a long-term coatings solution to provide barrier protection, UV stability and graffiti resistance.

Specifications

1 x DULUX Zincanode® 402 @ 75 µm

1 x DULUX Duremax® GPE @ 125 µm

1 x DULUX Weathermax® HBR @ 100 µm