Spirit of Tasmania Quay, VIC

Commercial Construction

With a tight construction deadline, winter temperatures were a concern for applicators seeking efficient recoat times. Fast-drying coatings helped the build finish on time while achieving the Australian Standard for corrosion protection (AS/NZS 2312.1:2014). Image courtesy of Maddison Wright Engineering.

Specifications

1 x DULUX Zincanode® 402 @ 75 μm

1 x DULUX Durebild® STE MIO @ 200 μm

1 x DULUX Luxathane® HPX @ 50 μm