Showing 258 of 310 Projects
With a tight construction deadline, winter temperatures were a concern for applicators seeking efficient recoat times. Fast-drying coatings helped the build finish on time while achieving the Australian Standard for corrosion protection (AS/NZS 2312.1:2014). Image courtesy of Maddison Wright Engineering.
The Sugar Terminals Limited jetty and wharf (formerly known as Queensland Sugar Limited (QSL) wharf) is in a severe marine environment, and hence requires a heavy duty barrier coating system.
Ease of application was a big factor in returning this excavator to service quickly. Durebild STE and Quantum 221 provided finish, protection and time efficiency.