Skye Road Level Crossing Removal Project, VIC

Infrastructure

Rail bridge in Frankston coated in three coat protective coatings system to create striking metallic finish that will resist corrosion, fading, staining and grafitti, extending the time between maintenance coats.

Click here for detailed case study.

Specifications

1 x DULUX Durebild® STE @ 80 μm

1 x DULUX Quantum® FX @ 60 μm

1 x DULUX Quantum® Clearcoat @ 60 μm