Showing 18 of 23 Projects
Eleven newly installed 55-metre gantries on the Monash Freeway in Victoria were coated with a 3-part system including Zincanode 402, Durebild STE MIO and Weathermax HBR to provide long lasting protection against atmospheric corrosion.
For steel cladding on a new freeway underpass, a customised version of Weathermax HBR delivered high opacity and lasting colour brilliance. Durebild STE primed the asset against corrosion.
Newcastle Museum used Dulux® Durebild® STE and Dulux® Weathermax® HBR coatings to protect steel archway beams from UV damage and corrosion. After seven years, the coatings were in excellent condition, with no film damage and minor staining.
The North East Link Program is set to transform Melbourne's transportation system, and Dulux® Protective Coatings played a role in ensuring the durability of the concrete tunnel moulds used in the project with high-quality protective coatings.