Woolworths Sydney Chilled and Fresh Distribution Centre, NSW

Commercial Construction

Protective coatings were applied across off site and on site steelwork, delivering corrosion protection, fire resistance, and durability through a three coat system, including intumescent fire protection, and high build weather resistant topcoats for long term structural performance requirements.

Click here for detailed case study.

Images courtesy of Action Alliance.

Specifications

Link Bridge Components

1 x DULUX Durepon® EZP @ 75 µm

1 x DULUX FIRETEX® FX6010 @ required FRL thickness requirements

2 x DULUX Weathermax® HBR @ 75 µm

Steel Columns

1 x DULUX FIRETEX® FX6010 @ required FRL thickness requirements

2 x DULUX Weathermax® HBR @ 75 µm