Skip to the content
Commercial Construction

Royal Hobart Hospital Redevelopment

Overview

The Royal Hobart Hospital Redevelopment steelwork was blasted and primed with Zincanode 402, then brought to site and erected. Due to the existing hospital's air conditioning intakes being within metres from the new build, Duration low VOC and low odour two pack products were used to complete the protective coating systems on site.

Specifications

1 x DULUX Zincanode 402 @ 75 µm

Spot Prime bare steel: DULUX Duration P23 @ 75 µm

1 x Duration® X21 @ 50 μm

1 x Duration T74 Gloss @ 50 μm

Where to buy Dulux Protective Coatings