Bridges
Bright Footbridge


Overview
The footbridge in Bright, Victoria required quick recoat option with outstanding weatherability and low odour given the bridge is used for daily commute of school children and public alike. The solution was a system comprising the Duration water borne two pack range.
Specifications
1 x Duration® P23 @ 75 μm
1 x Duration® X21 @ 50 μm
1 x Duration® T80 @ 50 μm